Project journal -- 30/11/16
Today we worked on adobe premiere pro as well as Photoshop and learned how to use the the software. Today is our deadline for our individual tasks.
Monday, 28 November 2016
Production Meeting Week 7 - 28/11/16
This morning as a group we discussed deadlines and how we can complete it by Wednesday 30th . Berfin asked anyone who needed help or support with their pre-production and distributed any work between Victor, Maarya and Berfin as they are done.
Lighting Plan - Berfin
Set Design & Proplist - Dani
Secondary Research - Dani
Production meeting Week 6 - 15/11/16
In this meeting, we spoke about what we had done.
Tasks that needs to be completed
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Keeley- Primary Research Evidence , script
Victor - Shooting- Camera Script
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Linking and inserts, script
Zak- Shot list, Logo
Abigail - Production Schedule, Lighting Plan
Week 5 - 14/11/16
This morning we discussed what was complete for the pre-production .For example Berfin, Victor and Maarya was done with their individual task and started to work with other people. Another example would be Berfin starting and designing the logo with Zak.
Complete Pre-production
Berfin - Budget & Reece
Victor - Equipment & Reece
Maarya - Storyboard
Project Journal week 4- 23/11/16
Today we carried on working on our tasks. I decided i will work on the shot list. We planned our production as well and what were going to do. I was planning out how each shot would be played out. I looked mainly on the studio to see what the setup was and see how each shot would be and how it would look on screen. I also wrote down notes as well to show what the cameras would do.
Wednesday, 23 November 2016
Recce
Images
|
Hazard
|
The location for this is in the control room of the studio. The possible hazards for this are wires being tangled up which could cause people to trip.
| |
The location for this is the TV studio. There could be a few hazards when approaching the doors because it’s quite narrow and there’s a bin on the left side which could cause someone to trip if they’re running or walking fast.
| |
The location for this is inside the TV studio. As it is quite particularly big it could cause obstruction. Also the heat from the light could be a hazard too.
| |
These cameras are based in the TV Studio. As they are quite big and hefty to move, this could cause a hazard to occur. Also it has many wires all over the place so people tripping over them would be a big hazard risk.
| |
These tables are right back in the middle of the TV studio. They are next to the exit so this could cause people to trip over and also cause objects to trip over.
| |
This computer is located in the Control room, there are many wires in this picture which is a hazard. The room is quite packed with lots of equipment and gear. So if there are more people in each station than there are meant to be, this will cause a hazard.
| |
The switchboard is located in the control room. The switchboard is based right in the left corner. This is very packed and tight, if it is over packed there could be a hazard
| |
The sound board is located in the control room, beside the soundboard are other pieces of equipment. This means there are lots of wires all over the place which is prone to a hazard.
| |
The plug switch is based right in the middle left of the TV Studio. It goes all the way to the back right of the room. So there are lots of wires on the floor which could cause people and/or objects to trip.
| |
This is the main power switches for the studio which is based right in the corner of the control room. The space between this and the switchboard is very thin so this could cause a hazard because it could get overly packed and could cause a hazard.
|
This is our recce for where we are recording our show. The studio is open however the control room is very small.
Monday, 21 November 2016
Project Journal 21/11/16
Today we were looking for alternative devices to film our shows. This is because both cameras we were using broke down due to some malfunctions. So we decided we should film on our ipads. Also today i finished the floor plan for our programme.
Monday, 14 November 2016
Project Journal -- 09/11/16
Today our group re-allocated our tasks to do. I was given another task on top of shot list , I was given the floor planning task. I never worked on this type of task before. I never done floorplanning before so this is new to me. I decided i would first look at the layout of our studio and see what is there. I then talked with Berfin as well as Kelley to ask about the layout of our set.
Project Journal -- 08/11/16
Today we carried on working on the tasks we selected. I was
finishing off the 'Shot list'. The shot list would be used for the storyboard. We discussed our deadlines and what we had to do. I looked at what i should improve on the shotlist. I decided i should change a bit more to make it more easier for the cameraman to understand.
Project Journal -- 07/11/16
Today we were in the studio room. We had a production
meeting talking about ideas and how to run the show. We talked about the use of
ipads and the set design. We looked over what roles we had and decided who will
work with who. So my shot list would be help with making story boards as well as planning every shot when we film.
Project Journal -- 1/11/16
1/11/16
Today my class and i went into the TV studio and looked at
the equipment. We practised with a Jeremy Kyle type of show. We set up 3
cameras showing different angles. We split up into different groups. One group
where acting as well as operating the cameras. The other group on the other
hand where went into the control Room. We divided roles between us. I wanted to
use the vision mixer but someone else decided to use it. So I decided to be the
soundman by using 'mixing desk'. I learnt the basics of how to use it. It was
very challenging in the beginning because it was new to me. However as the scenario was being played out i knew when to play out the clapping sound from the computer. One of the things which was hard was to keep everything going at the same time for example someone put up a sound clip of clapping i had to play that on to the studio. It was hard to lower the presenters microphone voice and put the clapping sound higher.
Production meeting Week 4 - 09/11/16
Today we discussed the main part of the pre-production as we had a deadline on the 14th of November. Every team member was given a little update where they were on the pre-production. We then carried on with our work.
Storyboard
Equipment check
Research evidence
Location recce
Production meeting -- Week 3 -7/11/16
This week as a group we decided to give out individual tasks to each member of our team.
Dani - Props list and set design( Including logos) & Secondary Research Evidence
Berfin - Budget & Regular Production Meeting (Regular blog post),
Keeley- Primary Research Evidence , script
Victor - Shooting- Camera Script, Equipment checklist
Maarya- Storyboard & Risk assessments
Chai-ann- Production Schedule & Shooting- Camera Script
Timi - Location Recce, Linking and inserts
Zak- Shot list, Studio floor plans
Abigail - Production Schedule, Lighting Plan
Production meeting -- Week 2 - 02/11/16
During our second meeting we discussed our TV show and the different types of close ups we can use and includes in our show. For an example,we liked the idea of having close up of the iPad in the show and most likely we will need to use pre-record clips and insert them on the production day.
Wednesday, 9 November 2016
Production meeting -- Week 1 -31/10/16
On this day we had our first meeting as a group. We discussed what the content of the show was and how we can set up the Studio room for it. Overall, we plan what each role was and what had to be done for it.
Sourced from Keeley’s Blogger
"my idea is to use social media to create a game show, there will be two teams of three and each team will compete to create funny and creative images and videos using social sites such as snapchat, tumblr and music.ly. the ages will range from 15-25 and the watershed will be from 9:30pm."
Tuesday, 8 November 2016
Project Journal --31/10/16
31/10/16
Today we allocated tasks to ourselves for our Multicam assignment. I decided i would do the shot list and work on how each shot would be during the show. I am also doing the shot list in another unit so i can work on both things twice. I already have an idea on how to work on one. The shot list is not too difficult to do but planning each shot would affect the show and how people would view it.
Today we allocated tasks to ourselves for our Multicam assignment. I decided i would do the shot list and work on how each shot would be during the show. I am also doing the shot list in another unit so i can work on both things twice. I already have an idea on how to work on one. The shot list is not too difficult to do but planning each shot would affect the show and how people would view it.